Line A Replacement Project (Nevada County) is a pipeline replacement in Arkansas, operated by Centerpoint Energy Gas Transmission. Construction began in 2012.

Line A Replacement Project (Nevada County)
General information
KindPipeline project[1]
Project typeReplacement[2]
StatusIn service[3]
Owner and operator
StateArkansas[1]
CountiesNevada[1]
Construction started5 November 2012[4]
FERC docketCP12-500[2]
Technical information
Pipe size12"[5]
Cost$8,084,600[5]
On ProvenHand
Hands listed0

Line A Replacement Project (Nevada County) is a pipeline replacement in Arkansas, operated by Centerpoint Energy Gas Transmission. Construction began in 2012.

Crossings

FeatureMethod
Steel Creek[4]HDD

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line A Replacement Project (Nevada County)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC notice of request under blanket authorization, Line A Replacement Project (Nevada County) (CP12-500)”. FERC. 28 August 2012. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP12-500”. Federal Energy Regulatory Commission. 15 August 2012. Retrieved 3 October 2026.
  3. “Line A Replacement Project weekly status report, June 28 to July 4, 2013 (CP12-500)”. CenterPoint Energy Gas Transmission Company, LLC (filed with FERC). 5 July 2013. Retrieved 4 October 2026.
  4. “Line A Replacement Project weekly status report, November 5 to 8, 2012 (CP12-500)”. CenterPoint Energy Gas Transmission Company, LLC (filed with FERC). 9 November 2012. Retrieved 4 October 2026.
  5. “Environmental Assessment Report, Line A Replacement Project (Nevada County) (CP12-500)”. FERC. 26 October 2012. Retrieved 4 October 2026.