Line A Replacement Project (Nevada County)
From the ProvenHand pipeline wiki
Line A Replacement Project (Nevada County) is a pipeline replacement in Arkansas, operated by Centerpoint Energy Gas Transmission. Construction began in 2012.
| Line A Replacement Project (Nevada County) | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[2] |
| Status | In service[3] |
| Owner and operator | |
| State | Arkansas[1] |
| Counties | Nevada[1] |
| Construction started | 5 November 2012[4] |
| FERC docket | CP12-500[2] |
| Technical information | |
| Pipe size | 12"[5] |
| Cost | $8,084,600[5] |
| On ProvenHand | |
| Hands listed | 0 |
Line A Replacement Project (Nevada County) is a pipeline replacement in Arkansas, operated by Centerpoint Energy Gas Transmission. Construction began in 2012.
Crossings
| Feature | Method |
|---|---|
| Steel Creek[4] | HDD |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line A Replacement Project (Nevada County)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC notice of request under blanket authorization, Line A Replacement Project (Nevada County) (CP12-500)”. FERC. 28 August 2012. Retrieved 4 October 2026.
- “FERC eLibrary docket CP12-500”. Federal Energy Regulatory Commission. 15 August 2012. Retrieved 3 October 2026.
- “Line A Replacement Project weekly status report, June 28 to July 4, 2013 (CP12-500)”. CenterPoint Energy Gas Transmission Company, LLC (filed with FERC). 5 July 2013. Retrieved 4 October 2026.
- “Line A Replacement Project weekly status report, November 5 to 8, 2012 (CP12-500)”. CenterPoint Energy Gas Transmission Company, LLC (filed with FERC). 9 November 2012. Retrieved 4 October 2026.
- “Environmental Assessment Report, Line A Replacement Project (Nevada County) (CP12-500)”. FERC. 26 October 2012. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.