Line A90 and A79 Make Piggable Project

From the ProvenHand pipeline wiki

Line A90 and A79 Make Piggable Project is a pipeline project, operated by Columbia Gas Transmission, LLC.

Line A90 and A79 Make Piggable Project
General information
KindPipeline project[1]
StatusUnder construction[2]
Owner and operator
CountiesFairfield, Greene, Madison, Pickaway[3]
Approved28 February 2026[4]
FERC docketCP26-50[1]
Technical information
Pipe size20"[3]
Cost$20 million[3]
On ProvenHand
Hands listed0

Line A90 and A79 Make Piggable Project is a pipeline project, operated by Columbia Gas Transmission, LLC.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line A90 and A79 Make Piggable Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP26-50”. Federal Energy Regulatory Commission. 19 December 2025. Retrieved 3 October 2026.
  2. “Columbia Gas Transmission, LLC submits Weekly Construction Status Report No. 30 for the period of 09/21/2026 to 09/27/2026 re the Line A90 and A79 Make Piggable Project under CP26-50.”. Columbia Gas Transmission, LLC (filed with FERC). 29 September 2026. Retrieved 3 October 2026.
  3. “Environmental Assessment Report for Columbia Gas Transmission, LLC's Sections 157.205 and 157.208 under CP26-50.”. Federal Energy Regulatory Commission (staff document). 27 February 2026. Retrieved 3 October 2026.
  4. “Columbia Gas Transmission, LLC submits Weekly Construction Status Report No. 1 for the period of 03/02/2026 to 03/08/2026 re the Line A90 and A79 Make Piggable Project under CP26-50.”. Columbia Gas Transmission, LLC (filed with FERC). 12 March 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.