Line AD Transportation Expansion

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Line AD Transportation Expansion is a natural gas pipeline expansion, operated by Centerpoint Energy Gas Transmission. It entered service in 2005.

Line AD Transportation Expansion
Also calledCEGT Line AD Expansion Project[1]
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StateOK[1] or OK, TX[2][sources disagree]
CountiesCaddo, Grady, Hughes[3]
Approved27 May 2005[1][3]
In service30 November 2005[2]
FERC docketCP05-3[1]
Technical information
Pipe size24", 42"[2]
Capacity112.9 MMcf/d (FERC project list)[1][2]
Capacity addedapproximately 112,900 Dth per day[3]
Horsepower added28,265 hp[3]
Cost$31.9 million (EIA estimate; no dollar year given)[2][3]
On ProvenHand
Hands listed0

Line AD Transportation Expansion is a natural gas pipeline expansion, operated by Centerpoint Energy Gas Transmission. It entered service in 2005.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line AD Transportation Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Order Issuing Certificate, CenterPoint Energy Gas Transmission, Line AD Expansion Project (CP05-3)”. FERC. 27 May 2005. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.