Line AM-22 Replacement Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Line AM-22 Replacement Project is a natural gas pipeline replacement in Arkansas, operated by Centerpoint Energy Gas Transmission. It runs 7.9 miles of 10" pipe.

Line AM-22 Replacement Project
General information
Project typeReplacement[1]
CommodityNatural gas[2]
Owner and operator
StateArkansas[2]
CountiesGarland, Hot Spring[2]
FERC docketCP09-467[1]
Technical information
Length7.9 mi[2]
Pipe size10 in[2] or 4 in, 10 in[3][sources disagree]
Cost$11,096,296[2]
On ProvenHand
Hands listed0

Line AM-22 Replacement Project is a natural gas pipeline replacement in Arkansas, operated by Centerpoint Energy Gas Transmission. It runs 7.9 miles of 10" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Diameters

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line AM-22 Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP09-467”. Federal Energy Regulatory Commission. 22 September 2009. Retrieved 3 October 2026.
  2. “Notice of request under blanket authorization, CenterPoint Energy Gas Transmission Company (CP09-467)”. FERC. 30 September 2009. Retrieved 4 October 2026.
  3. “Environmental Assessment Report, Line AM-22 Replacement Project (CP09-467)”. FERC. 21 October 2009. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.