Line D100 ILI East Make Piggable Project
From the ProvenHand pipeline wiki
Line D100 ILI East Make Piggable Project is a natural gas pipeline in Ohio, operated by Columbia Gas Transmission, LLC.
| Line D100 ILI East Make Piggable Project | |
|---|---|
| Also called | Line D100 In-Line Inspection Make Piggable Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Status | In service[3] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Ohio[1] |
| Counties | Crawford, Huron, Richland, Seneca[1] |
| FERC docket | CP23-537[2] |
| Technical information | |
| Cost | $16,400,000[1] |
| On ProvenHand | |
| Hands listed | 0 |
Line D100 ILI East Make Piggable Project is a natural gas pipeline in Ohio, operated by Columbia Gas Transmission, LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line D100 ILI East Make Piggable Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Environmental Assessment Report, Line D100 In-Line Inspection East Make Piggable Project (CP23-537)”. FERC. 13 November 2023. Retrieved 4 October 2026.
- “FERC eLibrary docket CP23-537”. Federal Energy Regulatory Commission. 5 September 2023. Retrieved 3 October 2026.
- “Weekly Construction Status Report No. 25, final (Aug 2024), Line D100 ILI East Make Piggable Project (CP23-537)”. Columbia Gas Transmission, LLC (filed with FERC). 15 August 2024. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.