Line D100 ILI Make Piggable Project
From the ProvenHand pipeline wiki
Line D100 ILI Make Piggable Project is a natural gas pipeline in Ohio, operated by Columbia Gas Transmission, LLC. It was built and entered service in 2023.
| Line D100 ILI Make Piggable Project | |
|---|---|
| Also called | Line D100 West ILI Make Piggable Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Status | In service[3] |
| Commodity | Natural gas[4] |
| Owner and operator | |
| State | Ohio[4] |
| Counties | Sandusky, Seneca, Wood[4] |
| Construction started | March 2023[5] |
| In service | 16 November 2023[3] |
| FERC docket | CP23-16[2] |
| Contractors | |
| Technical information | |
| Pipe size | 20"[4] |
| Cost | approximately $31 million[4] |
| On ProvenHand | |
| Hands listed | 0 |
Line D100 ILI Make Piggable Project is a natural gas pipeline in Ohio, operated by Columbia Gas Transmission, LLC. It was built and entered service in 2023.
Contractorsedit
| Contractor | Work |
|---|---|
| C J Hughes[5] | installed a gravel access drive at Mod Point 1 (role otherwise not stated) |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line D100 ILI Make Piggable Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Environmental Assessment Report, Columbia Sections 157.205 and 157.208 (CP23-16)”. Federal Energy Regulatory Commission (staff report). 18 January 2023. Retrieved 4 October 2026.
- “FERC eLibrary docket CP23-16”. Federal Energy Regulatory Commission. 18 November 2022. Retrieved 3 October 2026.
- “Weekly Construction Status Report No. 58 (final), Line D100 ILI Make Piggable Project (CP23-16)”. Columbia Gas Transmission, LLC (filed with FERC). 7 May 2024. Retrieved 4 October 2026.
- “Notice of Request Under Blanket Authorization, Columbia Gas Transmission, LLC (CP23-16)”. Federal Energy Regulatory Commission. 28 November 2022. Retrieved 4 October 2026.
- “Weekly Construction Status Report No. 001, Line D100 ILI Make Piggable Project (CP23-16)”. Columbia Gas Transmission, LLC (filed with FERC). 12 April 2023. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.