Line D322 East ILI Make Piggable Project
From the ProvenHand pipeline wiki
Line D322 East ILI Make Piggable Project is a natural gas pipeline in Ohio, operated by Columbia Gas Transmission, LLC.
| Line D322 East ILI Make Piggable Project | |
|---|---|
| Also called | Line D322 East ILI Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Status | In service[3] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Ohio[1] |
| Counties | Allen, Hardin, Marion, Morrow[1] |
| FERC docket | CP24-15[2] |
| Technical information | |
| Cost | $16.4 million[1] |
| On ProvenHand | |
| Hands listed | 0 |
Line D322 East ILI Make Piggable Project is a natural gas pipeline in Ohio, operated by Columbia Gas Transmission, LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line D322 East ILI Make Piggable Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Environmental Assessment Report, Line D322 East ILI Project (CP24-15)”. FERC. 16 January 2024. Retrieved 4 October 2026.
- “FERC eLibrary docket CP24-15”. Federal Energy Regulatory Commission. 6 November 2023. Retrieved 3 October 2026.
- “Weekly Construction Status Report No. 30, final (Feb 2025), Line D322 East ILI Project (CP24-15)”. Columbia Gas Transmission, LLC (filed with FERC). 20 February 2025. Retrieved 4 October 2026.