Line D420 ILI Make Piggable Project
From the ProvenHand pipeline wiki
Line D420 ILI Make Piggable Project is a natural gas pipeline in Ohio, operated by Columbia Gas Transmission, LLC.
| Line D420 ILI Make Piggable Project | |
|---|---|
| Also called | Line D420 In-Line Inspection Make Piggable Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Status | In service[3] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Ohio[1] |
| Counties | Lucas, Ottawa, Sandusky[1] |
| FERC docket | CP23-18[2] |
| Technical information | |
| Cost | $13,000,000[1] |
| On ProvenHand | |
| Hands listed | 0 |
Line D420 ILI Make Piggable Project is a natural gas pipeline in Ohio, operated by Columbia Gas Transmission, LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line D420 ILI Make Piggable Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Environmental Assessment Report, Line D420 In-Line Inspection Make Piggable Project (CP23-18)”. FERC. 30 January 2023. Retrieved 4 October 2026.
- “FERC eLibrary docket CP23-18”. Federal Energy Regulatory Commission. 21 November 2022. Retrieved 3 October 2026.
- “Weekly Construction Status Report No. 040, final (March 10 to 16, 2024), D420 ILI Make Piggable Project (CP23-18)”. Columbia Gas Transmission, LLC (filed with FERC). 21 March 2024. Retrieved 4 October 2026.