Line D420 ILI Make Piggable Project

From the ProvenHand pipeline wiki

Line D420 ILI Make Piggable Project is a natural gas pipeline in Ohio, operated by Columbia Gas Transmission, LLC.

Line D420 ILI Make Piggable Project
Also calledLine D420 In-Line Inspection Make Piggable Project[1]
General information
KindPipeline project[2]
StatusIn service[3]
CommodityNatural gas[1]
Owner and operator
StateOhio[1]
CountiesLucas, Ottawa, Sandusky[1]
FERC docketCP23-18[2]
Technical information
Cost$13,000,000[1]
On ProvenHand
Hands listed0

Line D420 ILI Make Piggable Project is a natural gas pipeline in Ohio, operated by Columbia Gas Transmission, LLC.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line D420 ILI Make Piggable Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Environmental Assessment Report, Line D420 In-Line Inspection Make Piggable Project (CP23-18)”. FERC. 30 January 2023. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP23-18”. Federal Energy Regulatory Commission. 21 November 2022. Retrieved 3 October 2026.
  3. “Weekly Construction Status Report No. 040, final (March 10 to 16, 2024), D420 ILI Make Piggable Project (CP23-18)”. Columbia Gas Transmission, LLC (filed with FERC). 21 March 2024. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.