Line DT and DS Replacement Project
From the ProvenHand pipeline wiki
Line DT and DS Replacement Project is a natural gas pipeline replacement in Kansas, operated by Southern Star Central Gas Pipeline, Inc.. It entered service in 2020. It runs 31.5 miles of 36" pipe.
| Line DT and DS Replacement Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1][2] |
| Status | In service[1][3] |
| Commodity | Natural gas[1][4] |
| Operator | |
| Owner and operator | |
| State | Kansas[1][4] |
| Counties | Anderson, Franklin[4] |
| Approved | 19 December 2019[4] |
| In service | 23 November 2020[1][3] |
| FERC docket | CP19-31[1] |
| Technical information | |
| Length | 31.5 mi[1][4] |
| Pipe size | 36 in[1] or 2 in, 3 in, 4 in, 36 in[4][sources disagree] |
| Cost | $99.1 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Line DT and DS Replacement Project is a natural gas pipeline replacement in Kansas, operated by Southern Star Central Gas Pipeline, Inc.. It entered service in 2020. It runs 31.5 miles of 36" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line DT and DS Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP19-31”. Federal Energy Regulatory Commission. 21 December 2018. Retrieved 3 October 2026.
- “Letter order approving Southern Star Central Gas Pipeline, Inc.'s 11/20/2020 request to place in-service the Lines DT and DS Replacement Project (CP19-31)”. FERC. 23 November 2020. Retrieved 4 October 2026.
- “Order Issuing Certificate and Approving Abandonment, Southern Star Central Gas Pipeline, Inc., Lines DT and DS Replacement Project (CP19-31)”. FERC. 19 December 2019. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.