Line DT and DS Replacement Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Line DT and DS Replacement Project is a natural gas pipeline replacement in Kansas, operated by Southern Star Central Gas Pipeline, Inc.. It entered service in 2020. It runs 31.5 miles of 36" pipe.

Line DT and DS Replacement Project
General information
KindPipeline project[1]
Project typeReplacement[1][2]
StatusIn service[1][3]
CommodityNatural gas[1][4]
Operator
Owner and operator
StateKansas[1][4]
CountiesAnderson, Franklin[4]
Approved19 December 2019[4]
In service23 November 2020[1][3]
FERC docketCP19-31[1]
Technical information
Length31.5 mi[1][4]
Pipe size36 in[1] or 2 in, 3 in, 4 in, 36 in[4][sources disagree]
Cost$99.1 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Line DT and DS Replacement Project is a natural gas pipeline replacement in Kansas, operated by Southern Star Central Gas Pipeline, Inc.. It entered service in 2020. It runs 31.5 miles of 36" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Diameters
  • 36 in[1]
  • 2 in, 3 in, 4 in, 36 in[4]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line DT and DS Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP19-31”. Federal Energy Regulatory Commission. 21 December 2018. Retrieved 3 October 2026.
  3. “Letter order approving Southern Star Central Gas Pipeline, Inc.'s 11/20/2020 request to place in-service the Lines DT and DS Replacement Project (CP19-31)”. FERC. 23 November 2020. Retrieved 4 October 2026.
  4. “Order Issuing Certificate and Approving Abandonment, Southern Star Central Gas Pipeline, Inc., Lines DT and DS Replacement Project (CP19-31)”. FERC. 19 December 2019. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.