Line ESA Replacement Project
From the ProvenHand pipeline wiki
Line ESA Replacement Project is a natural gas pipeline replacement in Kansas, operated by Southern Star Central Gas Pipeline, Inc.. Construction began in 2023. It runs 6.6 miles of 16" pipe.
| Line ESA Replacement Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Kansas[2] |
| Counties | Douglas, Leavenworth[2] |
| Construction started | June 2023[3] |
| FERC docket | CP23-161[1] |
| Technical information | |
| Length | 6.6 mi[2] |
| Pipe size | 16"[2] |
| Cost | $20,900,000[2] |
| On ProvenHand | |
| Hands listed | 0 |
Line ESA Replacement Project is a natural gas pipeline replacement in Kansas, operated by Southern Star Central Gas Pipeline, Inc.. Construction began in 2023. It runs 6.6 miles of 16" pipe.
Crossings
| Feature | Method |
|---|---|
| Highway 40[2] | HDD |
| Kansas River[2] | HDD |
| Lawrence Airport[2] | HDD |
| Mud Creek[2] | HDD |
| Union Pacific Railroad[2] | HDD |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line ESA Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP23-161”. Federal Energy Regulatory Commission. 17 April 2023. Retrieved 3 October 2026.
- “Environmental Assessment Report, Southern Star Prior Notice Filing, Line ESA Replacement Project (CP23-161)”. Federal Energy Regulatory Commission (staff report). 20 June 2023. Retrieved 4 October 2026.
- “Weekly Environmental Report No. 1, Line ESA Replacement Project (CP23-161)”. Southern Star Central Gas Pipeline, Inc. (filed with FERC). 28 June 2023. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.