Line ESA Replacement Project is a natural gas pipeline replacement in Kansas, operated by Southern Star Central Gas Pipeline, Inc.. Construction began in 2023. It runs 6.6 miles of 16" pipe.

Line ESA Replacement Project
General information
KindPipeline project[1]
Project typeReplacement[1]
CommodityNatural gas[2]
Owner and operator
StateKansas[2]
CountiesDouglas, Leavenworth[2]
Construction startedJune 2023[3]
FERC docketCP23-161[1]
Technical information
Length6.6 mi[2]
Pipe size16"[2]
Cost$20,900,000[2]
On ProvenHand
Hands listed0

Line ESA Replacement Project is a natural gas pipeline replacement in Kansas, operated by Southern Star Central Gas Pipeline, Inc.. Construction began in 2023. It runs 6.6 miles of 16" pipe.

Crossings

FeatureMethod
Highway 40[2]HDD
Kansas River[2]HDD
Lawrence Airport[2]HDD
Mud Creek[2]HDD
Union Pacific Railroad[2]HDD

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line ESA Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP23-161”. Federal Energy Regulatory Commission. 17 April 2023. Retrieved 3 October 2026.
  2. “Environmental Assessment Report, Southern Star Prior Notice Filing, Line ESA Replacement Project (CP23-161)”. Federal Energy Regulatory Commission (staff report). 20 June 2023. Retrieved 4 October 2026.
  3. “Weekly Environmental Report No. 1, Line ESA Replacement Project (CP23-161)”. Southern Star Central Gas Pipeline, Inc. (filed with FERC). 28 June 2023. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.