Line H-152 Pipe Replacement Project
From the ProvenHand pipeline wiki
Line H-152 Pipe Replacement Project is a pipeline replacement, operated by Equitrans, L.P.. Construction began in 2007. It runs 12.6 miles of 16" pipe.
| Line H-152 Pipe Replacement Project | |
|---|---|
| Also called | H-152 Pipeline Renewal Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Replacement[2][3] |
| Owner and operator | |
| Counties | Allegheny[3] |
| Construction started | June 2007[1] |
| FERC docket | CP07-85[2] |
| Contractors | |
| Technical information | |
| Length | 12.6 mi[3] |
| Pipe size | 16"[3] |
| Cost | $24,594,494 (Equitrans estimate)[3] |
| On ProvenHand | |
| Hands listed | 0 |
Line H-152 Pipe Replacement Project is a pipeline replacement, operated by Equitrans, L.P.. Construction began in 2007. It runs 12.6 miles of 16" pipe.
Contractorsedit
| Contractor | Work |
|---|---|
| Skibeck Pipeline Company, Inc.[1] | Prime |
| GAI Consultants, Inc.[1] | engineering drawings for silt fence and residential safety fence |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line H-152 Pipe Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Weekly Status Report for 6/2/07 to 6/8/07, H-152 Pipeline Renewal Project, Equitrans, L.P. (CP07-85)”. Equitrans, L.P. (filed with FERC). 13 June 2007. Retrieved 4 October 2026.
- “FERC eLibrary docket CP07-85”. Federal Energy Regulatory Commission. 16 February 2007. Retrieved 3 October 2026.
- “Equitrans, L.P.; Notice of Request Under Blanket Authorization (Docket No. CP07-85-000), Federal Register E7-6559”. Federal Energy Regulatory Commission (published in the Federal Register). 9 April 2007. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.