Line N Compressor Installation Proj
From the ProvenHand pipeline wiki
Line N Compressor Installation Proj is a pipeline expansion in Pennsylvania, operated by National Fuel Gas Supply Corporation. It was built and entered service in 2011. It runs 1.9 miles of 20" pipe.
| Line N Compressor Installation Proj | |
|---|---|
| Also called | Line N Compressor Installation Expansion Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Expansion[1] |
| Status | In service[3] |
| Owner and operator | |
| Facility project | |
| State | Pennsylvania[2] |
| Counties | Washington[5] |
| Approved | 16 December 2010[2] |
| Construction started | 9 February 2011[6] |
| In service | 19 October 2011[3] |
| FERC docket | CP10-458[2] |
| FERC pre-filing docket | PF10-1[2] |
| Technical information | |
| Length | 1.9 mi[2] |
| Pipe size | 20"[5] |
| Capacity | 150 MMcf/d (FERC project list)[2] |
| Horsepower added | 5,000 hp[5] |
| On ProvenHand | |
| Hands listed | 0 |
Line N Compressor Installation Proj is a pipeline expansion in Pennsylvania, operated by National Fuel Gas Supply Corporation. It was built and entered service in 2011. It runs 1.9 miles of 20" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line N Compressor Installation Proj? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP10-458”. Federal Energy Regulatory Commission. 11 June 2010. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “In Service Notice, Line N Projects (CP10-457 and CP10-458)”. National Fuel Gas Supply Corporation (filed with FERC). 20 October 2011. Retrieved 4 October 2026.
- “Order Issuing Certificates, National Fuel Gas Supply Corporation, Line N Projects (CP10-457 and CP10-458)”. Federal Energy Regulatory Commission. 16 December 2010. Retrieved 4 October 2026.
- “Final Cost Report Pursuant to 157.20(c)(3), Line N Projects (CP10-457, CP10-458)”. National Fuel Gas Supply Corporation (filed with FERC). 19 April 2012. Retrieved 4 October 2026.
- “Notice of Commencement of Construction of the Buffalo Compressor Station (CP10-457 et al.)”. National Fuel Gas Supply Corporation (filed with FERC). 15 February 2011. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.