Line NM-44 NY and Line U NY Replacement Project

From the ProvenHand pipeline wiki

Line NM-44 NY and Line U NY Replacement Project is a pipeline replacement, operated by National Fuel Gas Supply Corporation. Construction began in 2015.

Line NM-44 NY and Line U NY Replacement Project
General information
KindPipeline project[1]
Project typeReplacement[1]
StatusIn service[2]
Owner and operator
CountiesErie[3]
Construction startedMarch 2015[4]
FERC docketCP15-36[1]
Technical information
Pipe size16", 20"[3]
Cost$12 million (National Fuel estimate)[3]
On ProvenHand
Hands listed0

Line NM-44 NY and Line U NY Replacement Project is a pipeline replacement, operated by National Fuel Gas Supply Corporation. Construction began in 2015.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line NM-44 NY and Line U NY Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP15-36”. Federal Energy Regulatory Commission. 19 December 2014. Retrieved 3 October 2026.
  2. “Final environmental inspection report, October 12 to 18, 2015, Line NM-44 NY and Line U NY Replacement Project (CP15-36)”. National Fuel Gas Supply Corporation (filed with FERC). 23 October 2015. Retrieved 4 October 2026.
  3. “National Fuel Gas Supply Corporation; Notice of Request Under Blanket Authorization (Docket No. CP15-36-000), Federal Register 2014-30845”. Federal Energy Regulatory Commission (published in the Federal Register). 5 January 2015. Retrieved 4 October 2026.
  4. “Weekly environmental inspection report, March 16 to 22, 2015, Line NM-44 NY and Line U NY Replacement Project (CP15-36)”. National Fuel Gas Supply Corporation (filed with FERC). 24 March 2015. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.