Line O-731 Replacement Project is a pipeline replacement in Ohio, operated by Columbia Gas Transmission, LLC. Construction began in 2018.

Line O-731 Replacement Project
Also calledO-731 Bare Steel Replacement Project[1]
General information
Project typeReplacement[2]
Owner and operator
StateOhio[3]
CountiesCoshocton, Muskingum[3][4]
Approved10 February 2018[1]
Construction startedMarch 2018[1]
FERC docketCP18-22[2]
Technical information
Length7.7 mi[5] or 7.6 mi[4][sources disagree]
Pipe size10"[5]
Cost$27,200,000[5]
On ProvenHand
Hands listed0

Line O-731 Replacement Project is a pipeline replacement in Ohio, operated by Columbia Gas Transmission, LLC. Construction began in 2018.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line O-731 Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Weekly Environmental Inspector Report Nos. 3 and 4, O-731 Bare Steel Replacement Project (CP18-22)”. Columbia Gas Transmission, LLC (filed with FERC). 12 March 2018. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP18-22”. Federal Energy Regulatory Commission. 1 December 2017. Retrieved 3 October 2026.
  3. “FERC notice of request under blanket authorization, Line O-731 Replacement Project (CP18-22)”. FERC. 11 December 2017. Retrieved 4 October 2026.
  4. “Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization (Docket No. CP18-22-000), Federal Register 2017-27172”. Federal Energy Regulatory Commission (published in the Federal Register). 18 December 2017. Retrieved 4 October 2026.
  5. “Environmental Assessment Report, Line O-731 Replacement Project (CP18-22)”. FERC. 8 February 2018. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.