Line Section 22 Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Line Section 22 Project is a natural gas pipeline expansion in Montana, operated by WBI Energy Transmission, Inc.. Construction began in 2019. It runs 9.5 miles of 12" pipe.

Line Section 22 Project
General information
KindPipeline project[1]
Project typeExpansion[1][2]
StatusIn service[1][3]
CommodityNatural gas[1]
Operator
Owner and operator
StateMontana[1]
CountiesCarbon, Yellowstone[4]
Construction startedJune 2019[5]
In service31 August 2021[1] or September 2020[3][sources disagree]
FERC docketCP19-105[1]
Technical information
Length9.5 mi[1]
Pipe size12"[6]
Capacity22.5 MMcf/d additional capacity (EIA)[1]
Capacity addedincreased capacity by 22.5 MMcf per day[3]
Cost$11.6 million (EIA estimate; no dollar year given)[1][6]
On ProvenHand
Hands listed0

Line Section 22 Project is a natural gas pipeline expansion in Montana, operated by WBI Energy Transmission, Inc.. Construction began in 2019. It runs 9.5 miles of 12" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
In service
  • 31 August 2021[1]
  • September 2020[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line Section 22 Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP19-105”. Federal Energy Regulatory Commission. 1 March 2019. Retrieved 3 October 2026.
  3. “MDU Resources Group, Inc. Form 10-K for 2020 (pipeline segment growth projects)”. MDU Resources Group, Inc. (SEC filing). 19 February 2021. Retrieved 4 October 2026.
  4. “Notice of Request Under Blanket Authorization, WBI Energy Transmission, Inc. (CP19-105)”. Federal Energy Regulatory Commission. 11 March 2019. Retrieved 4 October 2026.
  5. “Weekly Construction Progress Report No. 2, Line Section 22 Expansion Project (CP19-105)”. WBI Energy Transmission, Inc. (filed with FERC). 12 June 2019. Retrieved 4 October 2026.
  6. “Prior Notice Request, Line Section 22 Expansion Project, WBI Energy Transmission, Inc. (CP19-105)”. WBI Energy Transmission, Inc. (filed with FERC). 1 March 2019. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.