Line Section 27 Cherry Creek to Spring Creek Expansion Project
From the ProvenHand pipeline wiki
Line Section 27 Cherry Creek to Spring Creek Expansion Project is a natural gas pipeline in North Dakota, operated by WBI Energy Transmission, Inc.. It runs 12 miles of 24" pipe.
| Line Section 27 Cherry Creek to Spring Creek Expansion Project | |
|---|---|
| General information | |
| Status | In service[1] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | North Dakota[2] |
| Counties | McKenzie[2] |
| Announced | 29 June 2017[4] |
| FERC docket | CP18-21[3] |
| Technical information | |
| Length | 12 mi[2] |
| Pipe size | 24"[2] |
| Cost | $27,200,000[2] |
| On ProvenHand | |
| Hands listed | 0 |
Line Section 27 Cherry Creek to Spring Creek Expansion Project is a natural gas pipeline in North Dakota, operated by WBI Energy Transmission, Inc.. It runs 12 miles of 24" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line Section 27 Cherry Creek to Spring Creek Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Construction Inspection Report, Line Section 27 - Spring Creek to Cherry Creek Expansion Project (CP18-21)”. Federal Energy Regulatory Commission (Office of Energy Projects). 9 July 2019. Retrieved 3 October 2026.
- “Environmental Assessment Report, WBI Energy Line Section 27 Expansion (CP18-21)”. Federal Energy Regulatory Commission (Office of Energy Projects). 7 February 2018. Retrieved 3 October 2026.
- “FERC eLibrary docket CP18-21”. Federal Energy Regulatory Commission. 30 November 2017. Retrieved 3 October 2026.
- “WBI Energy Expanding Natural Gas Transportation Infrastructure in NW North Dakota (MDU Resources press release)”. MDU Resources Group, Inc. (WBI Energy's parent), via PR Newswire. 29 June 2017. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.