Line Section 7 Expansion Project is a natural gas pipeline expansion in North Dakota, operated by WBI Energy Transmission, Inc.. Construction began in 2022. It runs 9.6 miles of 8" pipe.
| Line Section 7 Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | In service[3] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | North Dakota[1] |
| Counties | McLean, Morton[1] |
| Construction started | March 2022[4] |
| FERC docket | CP22-6[2] |
| Technical information | |
| Length | 9.6 mi[1] |
| Pipe size | 8"[1] |
| Cost | $10.4 million[1] |
| On ProvenHand | |
| Hands listed | 0 |
Line Section 7 Expansion Project is a natural gas pipeline expansion in North Dakota, operated by WBI Energy Transmission, Inc.. Construction began in 2022. It runs 9.6 miles of 8" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line Section 7 Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Environmental Assessment Report, WBI Energy Line Section 7 Expansion Project (CP22-6)”. Federal Energy Regulatory Commission (Office of Energy Projects). 17 December 2021. Retrieved 3 October 2026.
- “FERC eLibrary docket CP22-6”. Federal Energy Regulatory Commission. 12 October 2021. Retrieved 3 October 2026.
- “Weekly Construction Progress Report No. 34 (final, period from October 31, 2022), Line Section 7 Expansion Project (CP22-6)”. WBI Energy Transmission, Inc. (filed with FERC). 9 November 2022. Retrieved 3 October 2026.
- “Weekly Construction Progress Report No. 1 (March 2022), Line Section 7 Expansion Project (CP22-6)”. WBI Energy Transmission, Inc. (filed with FERC). 24 March 2022. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.