Line SM-116 Forced Relocation Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Line SM-116 Forced Relocation Project is a natural gas pipeline replacement in West Virginia. Construction began in 2020 and the line entered service in 2021. It runs 0.8 miles of 20" pipe.

Line SM-116 Forced Relocation Project
Also calledLine SM-116 Force Relocation Project[1]
General information
KindPipeline project[2]
Project typeReplacement[2]
StatusIn service[2][3]
CommodityNatural gas[2]
Operator
Owner and operator
StateWest Virginia[2]
CountiesMingo[4]
Construction startedMarch 2020[5]
In service26 August 2021[2][3]
FERC docketCP20-28[2]
Contractors
Technical information
Length0.8 mi[2]
Pipe size20"[2]
Cost$23.2 million (EIA estimate; no dollar year given)[2][4]
On ProvenHand
Hands listed0

Line SM-116 Forced Relocation Project is a natural gas pipeline replacement in West Virginia. Construction began in 2020 and the line entered service in 2021. It runs 0.8 miles of 20" pipe.

Contractorsedit

ContractorWorkPrime or sub
Western Construction[5]Prime
Foothills Construction[5]subcontractor; mobilized with the prime to begin right-of-way clearing (scope not otherwise stated)Under Western Construction
MBI Logging[5]Clearing and reclamationUnder Western Construction

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Operator
  • TC Energy[2]
  • Columbia Gas Transmission, LLC[4]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line SM-116 Forced Relocation Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP20-28”. Federal Energy Regulatory Commission. 17 December 2019. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Weekly Report No. 80 (final), Line SM-116 Forced Relocation Project (CP20-28)”. Columbia Gas Transmission, LLC (filed with FERC). 30 September 2021. Retrieved 4 October 2026.
  4. “Notice of Request Under Blanket Authorization, Columbia Gas Transmission, LLC (CP20-28)”. Federal Energy Regulatory Commission. 26 December 2019. Retrieved 4 October 2026.
  5. “Weekly EI Report No. 1, Line SM-116 Forced Relocation Project (CP20-28)”. Columbia Gas Transmission, LLC (filed with FERC). 27 March 2020. Retrieved 4 October 2026.