Line SM-116 Forced Relocation Project
From the ProvenHand pipeline wiki
Line SM-116 Forced Relocation Project is a natural gas pipeline replacement in West Virginia. Construction began in 2020 and the line entered service in 2021. It runs 0.8 miles of 20" pipe.
| Line SM-116 Forced Relocation Project | |
|---|---|
| Also called | Line SM-116 Force Relocation Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Replacement[2] |
| Status | In service[2][3] |
| Commodity | Natural gas[2] |
| Operator | |
| Owner and operator | |
| State | West Virginia[2] |
| Counties | Mingo[4] |
| Construction started | March 2020[5] |
| In service | 26 August 2021[2][3] |
| FERC docket | CP20-28[2] |
| Contractors | |
| Technical information | |
| Length | 0.8 mi[2] |
| Pipe size | 20"[2] |
| Cost | $23.2 million (EIA estimate; no dollar year given)[2][4] |
| On ProvenHand | |
| Hands listed | 0 |
Line SM-116 Forced Relocation Project is a natural gas pipeline replacement in West Virginia. Construction began in 2020 and the line entered service in 2021. It runs 0.8 miles of 20" pipe.
Contractorsedit
| Contractor | Work | Prime or sub |
|---|---|---|
| Western Construction[5] | Prime | |
| Foothills Construction[5] | subcontractor; mobilized with the prime to begin right-of-way clearing (scope not otherwise stated) | Under Western Construction |
| MBI Logging[5] | Clearing and reclamation | Under Western Construction |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line SM-116 Forced Relocation Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP20-28”. Federal Energy Regulatory Commission. 17 December 2019. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Weekly Report No. 80 (final), Line SM-116 Forced Relocation Project (CP20-28)”. Columbia Gas Transmission, LLC (filed with FERC). 30 September 2021. Retrieved 4 October 2026.
- “Notice of Request Under Blanket Authorization, Columbia Gas Transmission, LLC (CP20-28)”. Federal Energy Regulatory Commission. 26 December 2019. Retrieved 4 October 2026.
- “Weekly EI Report No. 1, Line SM-116 Forced Relocation Project (CP20-28)”. Columbia Gas Transmission, LLC (filed with FERC). 27 March 2020. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.