Line SM-80 MAOP Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Line SM-80 MAOP Project is a pipeline replacement in West Virginia, operated by Columbia Gas Transmission, LLC. It entered service in 2017.

Line SM-80 MAOP Project
General information
KindPipeline project[1]
Project typeReplacement[1]
StatusIn service[2]
Operator
StateWest Virginia[1]
CountiesWayne[1]
Approved23 August 2016[3]
In serviceNovember 2017[2]
FERC docketCP15-549[2]
Technical information
Length3.8 mi[1] or 3.9 mi[4][sources disagree]
Pipe size30"[1]
On ProvenHand
Hands listed0

Line SM-80 MAOP Project is a pipeline replacement in West Virginia, operated by Columbia Gas Transmission, LLC. It entered service in 2017.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line SM-80 MAOP Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Ongoing Projects: Construction Underway (Pipeline News, February 2018)”. Pipeline News. February 2018. Retrieved 3 October 2026.
  2. “Letter order granting request to place SM-80 MAOP pipeline into service, Wayne County WV (CP15-549)”. Federal Energy Regulatory Commission (eLibrary filing). 1 November 2017. Retrieved 4 October 2026.
  3. “Order issuing certificate and granting abandonment, Columbia Gas Transmission, LLC (CP15-549)”. Federal Energy Regulatory Commission (eLibrary filing). 23 August 2016. Retrieved 4 October 2026.
  4. “SM-80 MAOP Restoration Project Environmental Assessment (CP15-549-000)”. Federal Energy Regulatory Commission. May 2016. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.