Line UNY Westwood 2025 Modernization Project
From the ProvenHand pipeline wiki
Line UNY Westwood 2025 Modernization Project is a pipeline replacement, operated by National Fuel Gas Supply Corporation. It entered service in 2025.
| Line UNY Westwood 2025 Modernization Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[2] |
| Status | In service[3] |
| Owner and operator | |
| Counties | Erie[2] |
| In service | 31 October 2025[3] |
| FERC docket | CP25-22[1] |
| Technical information | |
| Pipe size | 20"[2] |
| Cost | $14,400,000[2] |
| On ProvenHand | |
| Hands listed | 0 |
Line UNY Westwood 2025 Modernization Project is a pipeline replacement, operated by National Fuel Gas Supply Corporation. It entered service in 2025.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line UNY Westwood 2025 Modernization Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP25-22”. Federal Energy Regulatory Commission. 21 November 2024. Retrieved 3 October 2026.
- “Environmental Assessment Report for National Fuel Gas Supply Corporation's Sections 157.208(b) - Construction, acquisition, operation, replacement, and miscellaneous rearrangement of facilities; and 1”. Federal Energy Regulatory Commission (staff document). 31 January 2025. Retrieved 3 October 2026.
- “National Fuel Gas Supply Corporation submits Post-Construction Environmental Status Report for the period of 07/18/2026 through 09/18/2026 re the Line UNY Westwood 2025 Modernization Project under CP2”. National Fuel Gas Supply Corporation (filed with FERC). 23 September 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.