LNG Supply Pipeline Project
From the ProvenHand pipeline wiki
LNG Supply Pipeline Project is a natural gas facility project in PR, operated by Ecoelectrica L.p.. It entered service in 2022.
| LNG Supply Pipeline Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Status | In service[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | PR[3] |
| Approved | 19 June 2014[3] |
| In service | 13 February 2022[2] |
| FERC docket | CP13-516[1] |
| Technical information | |
| Pipe size | 1.5", 4", 6"[3] |
| On ProvenHand | |
| Hands listed | 0 |
LNG Supply Pipeline Project is a natural gas facility project in PR, operated by Ecoelectrica L.p.. It entered service in 2022.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on LNG Supply Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP13-516”. Federal Energy Regulatory Commission. 3 July 2013. Retrieved 3 October 2026.
- “Post-Construction Affirmative Statement, LNG Supply Pipeline Project (CP13-516)”. EcoEléctrica, L.P. (filed with FERC). 15 March 2022. Retrieved 4 October 2026.
- “Order Amending Authorization under Section 3, EcoEléctrica, L.P., LNG Supply Project (CP13-516)”. Federal Energy Regulatory Commission. 19 June 2014. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.