Longwall Mining Panel M2/M3 Project

From the ProvenHand pipeline wiki

Longwall Mining Panel M2/M3 Project is a natural gas pipeline replacement in Pennsylvania, operated by Texas Eastern Transmission, LP.

Longwall Mining Panel M2/M3 Project
Also calledLongwall Mining Panel M2 and M3 Project[1]
General information
KindPipeline project[2]
Project typeReplacement[3]
StatusProposed[4]
CommodityNatural gas[1]
Owner and operator
StatePennsylvania[1]
CountiesGreene[1]
FERC docketCP26-148[2]
Technical information
Pipe size30", 36"[3]
On ProvenHand
Hands listed0

Longwall Mining Panel M2/M3 Project is a natural gas pipeline replacement in Pennsylvania, operated by Texas Eastern Transmission, LP.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Longwall Mining Panel M2/M3 Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Longwall Mining Panel M2 and M3 Project (CP26-148)”. Federal Energy Regulatory Commission. 12 May 2026. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP26-148”. Federal Energy Regulatory Commission. 23 March 2026. Retrieved 3 October 2026.
  3. “Response to FERC's 08/17/2026 data request, with errata to Volume I (proposed activities), Longwall Mining Panel M2/M3 Project (CP26-148)”. Texas Eastern Transmission, LP (filed with FERC). 24 August 2026. Retrieved 3 October 2026.
  4. “Notice of Schedule for the Preparation of an Environmental Assessment for the Longwall Mining Panel M2 and M3 Project (CP26-148)”. Federal Energy Regulatory Commission. 12 June 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.