Louisiana Energy Access Project (LEAP) Expansion Phase 4
From the ProvenHand pipeline wiki
Louisiana Energy Access Project (LEAP) Expansion Phase 4 is a natural gas pipeline expansion in Louisiana, operated by Dte. It entered service in 2025. It runs 150 miles of 36" pipe.
| Louisiana Energy Access Project (LEAP) Expansion Phase 4 | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | Louisiana[1] |
| In service | September 2025[1] |
| Technical information | |
| Length | 150 mi[1] |
| Pipe size | 36"[1] |
| Capacity | 200 MMcf/d additional capacity (EIA)[1] |
| Capacity added | additional 0.2 Bcf/d of capacity[2] |
| On ProvenHand | |
| Hands listed | 0 |
Louisiana Energy Access Project (LEAP) Expansion Phase 4 is a natural gas pipeline expansion in Louisiana, operated by Dte. It entered service in 2025. It runs 150 miles of 36" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Louisiana Energy Access Project (LEAP) Expansion Phase 4? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “DT Midstream 2025 earnings slide presentation (8-K exhibit 99.2)”. DT Midstream, Inc. (filed with the SEC). Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.