Louisiana Energy Access Project (LEAP) Expansion Phase 4

From the ProvenHand pipeline wiki

Louisiana Energy Access Project (LEAP) Expansion Phase 4 is a natural gas pipeline expansion in Louisiana, operated by Dte. It entered service in 2025. It runs 150 miles of 36" pipe.

Louisiana Energy Access Project (LEAP) Expansion Phase 4
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
StateLouisiana[1]
In serviceSeptember 2025[1]
Technical information
Length150 mi[1]
Pipe size36"[1]
Capacity200 MMcf/d additional capacity (EIA)[1]
Capacity addedadditional 0.2 Bcf/d of capacity[2]
On ProvenHand
Hands listed0

Louisiana Energy Access Project (LEAP) Expansion Phase 4 is a natural gas pipeline expansion in Louisiana, operated by Dte. It entered service in 2025. It runs 150 miles of 36" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Louisiana Energy Access Project (LEAP) Expansion Phase 4? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “DT Midstream 2025 earnings slide presentation (8-K exhibit 99.2)”. DT Midstream, Inc. (filed with the SEC). Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.