Lousiana Energy Access Project (LEAP) Expansion Phase 1

From the ProvenHand pipeline wiki

Lousiana Energy Access Project (LEAP) Expansion Phase 1 is a natural gas pipeline expansion in Louisiana, operated by Dte. It entered service in 2023.

Lousiana Energy Access Project (LEAP) Expansion Phase 1
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
StateLouisiana[1]
In service30 August 2023[1][2]
Technical information
Capacity300 MMcf/d additional capacity (EIA)[1]
Capacity addedcapacity from 1.0 Bcf/d to 1.3 Bcf/d[2]
On ProvenHand
Hands listed0

Lousiana Energy Access Project (LEAP) Expansion Phase 1 is a natural gas pipeline expansion in Louisiana, operated by Dte. It entered service in 2023.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Lousiana Energy Access Project (LEAP) Expansion Phase 1? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “DT Midstream Completes Phase 1 LEAP Expansion”. DT Midstream, Inc. (GlobeNewswire release). 30 August 2023. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.