Lowman Pipeline
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Lowman Pipeline is a natural gas pipeline lateral in Alabama, operated by NextEra Energy.
| Lowman Pipeline | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | Alabama[1] |
| Announced | 22 October 2019[2] |
| In service | 31 July 2022[1] or September 2023[3][sources disagree] |
| Technical information | |
| Length | 50 mi[1] or 60 mi[3][sources disagree] |
| Pipe size | 16"[1] |
| Capacity | Total gross capacity 0.12 Bcf per day (NextEra 10-K, 2025)[3] |
| On ProvenHand | |
| Hands listed | 0 |
Lowman Pipeline is a natural gas pipeline lateral in Alabama, operated by NextEra Energy.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Lowman Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “NextEra Energy third-quarter 2019 results release (Form 8-K Exhibit 99)”. NextEra Energy, Inc. (SEC filing). 22 October 2019. Retrieved 4 October 2026.
- “NextEra Energy, Inc. Form 10-K for 2025: Regulated Natural Gas Transmission table”. NextEra Energy, Inc. (SEC filing). 13 February 2026. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.