Magnolia LNG
From the ProvenHand pipeline wiki
Magnolia LNG is a facility project at Magnolia LNG in Louisiana, operated by Magnolia LNG, LLC.
| Magnolia LNG | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Status | Approved[1] |
| Owner | |
| Owner and operator | |
| Facility | Magnolia LNG[1] |
| State | Louisiana[1] |
| Approved | 15 April 2016[3] |
| FERC docket | CP14-347[1] |
| FERC pre-filing docket | PF13-9[2] |
| Doe lng dockets | 12-183-LNG[4], 13-131-LNG[4] |
| Technical information | |
| Capacity added | 1.22 Bcfd (FERC LNG map, Sep 2026)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Magnolia LNG is a facility project at Magnolia LNG in Louisiana, operated by Magnolia LNG, LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Magnolia LNG? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: U.S. LNG export terminals (as of September 22, 2026)”. Federal Energy Regulatory Commission. 22 September 2026. Retrieved 3 October 2026.
- “FERC eLibrary docket CP14-347”. Federal Energy Regulatory Commission. 30 April 2014. Retrieved 3 October 2026.
- “Order Granting Authorization Under Section 3 of the Natural Gas Act and Issuing Certificates, Magnolia LNG, LLC et al. (CP14-347 et al.)”. FERC (eLibrary filing description). 15 April 2016. Retrieved 4 October 2026.
- “DOE: Long Term Applications Received by DOE to Export Domestically Produced LNG, CNG, CGL from the Lower-48 States (as of September 30, 2026)”. U.S. Department of Energy, Office of Fossil Energy and Carbon Management. 30 September 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.