Maritimes & Northeast Pipeline Phase III Project
From the ProvenHand pipeline wiki
Maritimes & Northeast Pipeline Phase III Project is a natural gas pipeline expansion in Massachusetts, operated by Maritimes & Northeast Pipeline. It entered service in 2003. It runs 25 miles of 24", 30" pipe.
| Maritimes & Northeast Pipeline Phase III Project | |
|---|---|
| Also called | Maritimes & Northeast Phase III Expansion[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Massachusetts[1][2] |
| Approved | 21 December 2001[2] |
| In service | 24 November 2003[1] |
| FERC docket | CP01-4[2] |
| Technical information | |
| Length | 25 mi[1][2] |
| Pipe size | 24", 30"[1] |
| Capacity | 360 MMcf/d (FERC project list)[2] or 230 MMcf/d additional capacity (EIA)[1][sources disagree] |
| Cost | $133.99 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Maritimes & Northeast Pipeline Phase III Project is a natural gas pipeline expansion in Massachusetts, operated by Maritimes & Northeast Pipeline. It entered service in 2003. It runs 25 miles of 24", 30" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Maritimes & Northeast Pipeline Phase III Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.