MarkWest Arkoma Connector Pipeline Project is a natural gas pipeline lateral in Oklahoma, operated by MarkWest Pioneer LLC. It was built and entered service in 2009. It runs 50 miles of 24" pipe.

MarkWest Arkoma Connector Pipeline Project
Also calledArkoma Connector Pipeline Project[1]
General information
KindPipeline project[2]
Project typeLateral[2]
StatusIn service[2]
CommodityNatural gas[2]
Operator
StateOklahoma[2]
CountiesAtoka, Bryan, Coal[3]
Approved12 November 2008[3]
Construction startedJanuary 2009[4]
In service14 July 2009[2][5]
FERC docketCP08-404[2]
Technical information
Length50 mi[2]
Pipe size24"[2]
Capacity638 MMcf/d additional capacity (EIA)[2]
Cost$75 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

MarkWest Arkoma Connector Pipeline Project is a natural gas pipeline lateral in Oklahoma, operated by MarkWest Pioneer LLC. It was built and entered service in 2009. It runs 50 miles of 24" pipe.

Inspection

FirmScopeYears
Amec Paragon Environmental Services[4][6]Prepared and filed the project's FERC bi-weekly environmental status reports during constructionfrom 1 January 2009

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on MarkWest Arkoma Connector Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP08-404”. Federal Energy Regulatory Commission. 20 May 2008. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Order Issuing Certificates, MarkWest Pioneer, L.L.C., Arkoma Connector Pipeline (CP08-404)”. Federal Energy Regulatory Commission. 12 November 2008. Retrieved 4 October 2026.
  4. “FERC Bi-Weekly Report #002, Arkoma Connector Pipeline Project (CP08-404)”. MarkWest Pioneer, L.L.C. (filed with FERC). 30 January 2009. Retrieved 4 October 2026.
  5. “Notice of Commencement of Service, Arkoma Connector Pipeline Project (CP08-404)”. MarkWest Pioneer, L.L.C. (filed with FERC). 15 July 2009. Retrieved 4 October 2026.
  6. “Bi-Weekly Status Report No. 001, Arkoma Connector Pipeline (CP08-404)”. MarkWest Pioneer, L.L.C. (filed with FERC). 9 January 2009. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.