MarkWest Arkoma Connector Pipeline Project
From the ProvenHand pipeline wiki
MarkWest Arkoma Connector Pipeline Project is a natural gas pipeline lateral in Oklahoma, operated by MarkWest Pioneer LLC. It was built and entered service in 2009. It runs 50 miles of 24" pipe.
| MarkWest Arkoma Connector Pipeline Project | |
|---|---|
| Also called | Arkoma Connector Pipeline Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Lateral[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Operator | |
| State | Oklahoma[2] |
| Counties | Atoka, Bryan, Coal[3] |
| Approved | 12 November 2008[3] |
| Construction started | January 2009[4] |
| In service | 14 July 2009[2][5] |
| FERC docket | CP08-404[2] |
| Technical information | |
| Length | 50 mi[2] |
| Pipe size | 24"[2] |
| Capacity | 638 MMcf/d additional capacity (EIA)[2] |
| Cost | $75 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
MarkWest Arkoma Connector Pipeline Project is a natural gas pipeline lateral in Oklahoma, operated by MarkWest Pioneer LLC. It was built and entered service in 2009. It runs 50 miles of 24" pipe.
Inspection
| Firm | Scope | Years |
|---|---|---|
| Amec Paragon Environmental Services[4][6] | Prepared and filed the project's FERC bi-weekly environmental status reports during construction | from 1 January 2009 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on MarkWest Arkoma Connector Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP08-404”. Federal Energy Regulatory Commission. 20 May 2008. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order Issuing Certificates, MarkWest Pioneer, L.L.C., Arkoma Connector Pipeline (CP08-404)”. Federal Energy Regulatory Commission. 12 November 2008. Retrieved 4 October 2026.
- “FERC Bi-Weekly Report #002, Arkoma Connector Pipeline Project (CP08-404)”. MarkWest Pioneer, L.L.C. (filed with FERC). 30 January 2009. Retrieved 4 October 2026.
- “Notice of Commencement of Service, Arkoma Connector Pipeline Project (CP08-404)”. MarkWest Pioneer, L.L.C. (filed with FERC). 15 July 2009. Retrieved 4 October 2026.
- “Bi-Weekly Status Report No. 001, Arkoma Connector Pipeline (CP08-404)”. MarkWest Pioneer, L.L.C. (filed with FERC). 9 January 2009. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.