Maysville Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Maysville Project is a natural gas pipeline expansion in Kentucky, operated by Columbia Gulf Transmission, LLC. It runs 42 miles of 30" pipe.

Maysville Project
Also calledMaysville Expansion Project[1]
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusProposed[2]
CommodityNatural gas[2]
Owner and operator
StateKentucky[2]
CountiesFleming, Mason, Rowan[3]
FERC docketCP26-25[1]
Technical information
Length42 mi[2]
Pipe size30"[2]
Capacity340 MMcf/d additional capacity (EIA)[2]
Cost$400 million (EIA estimate; no dollar year given)[2] or approximately $402 million[3][sources disagree]
On ProvenHand
Hands listed0

Maysville Project is a natural gas pipeline expansion in Kentucky, operated by Columbia Gulf Transmission, LLC. It runs 42 miles of 30" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $400 million (EIA estimate; no dollar year given)[2]
  • approximately $402 million[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Maysville Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP26-25”. Federal Energy Regulatory Commission. 17 November 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Application for a Certificate of Public Convenience and Necessity, Maysville Project (CP26-25)”. Columbia Gulf Transmission, LLC (filed with FERC). 17 November 2025. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.