McComb Compressor Station Reliability Project
From the ProvenHand pipeline wiki
McComb Compressor Station Reliability Project is a natural gas pipeline expansion in Mississippi, operated by Gulf South Pipeline Company, LLC. It entered service in 2021.
| McComb Compressor Station Reliability Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| State | Mississippi[1][3] |
| Counties | Walthall[3] |
| In service | March 2021[1] |
| FERC docket | CP20-32[1] |
| Technical information | |
| Capacity | 48 MMcf/d additional capacity (EIA)[1] |
| Capacity added | increase of certificated capacity of 48,000 dekatherms per day[3] |
| Units added | 1 × Solar Taurus 70-T10802S[3] |
| On ProvenHand | |
| Hands listed | 0 |
McComb Compressor Station Reliability Project is a natural gas pipeline expansion in Mississippi, operated by Gulf South Pipeline Company, LLC. It entered service in 2021.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on McComb Compressor Station Reliability Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP20-32”. Federal Energy Regulatory Commission. 20 December 2019. Retrieved 3 October 2026.
- “Notice of Request Under Blanket Authorization, Gulf South Pipeline Company, LP, McComb Compressor Station Reliability Project (CP20-32)”. FERC (public notice, eLibrary). 30 December 2019. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.