Medina New Drills Project

From the ProvenHand pipeline wiki

Medina New Drills Project is a facility project, operated by Columbia Gas Transmission, LLC.

Medina New Drills Project
General information
KindFacility project[1]
StatusUnder construction[2]
Owner and operator
CountiesMedina[3]
Approved28 February 2026[4]
FERC docketCP26-44[1]
Technical information
Cost$14 million[3]
On ProvenHand
Hands listed0

Medina New Drills Project is a facility project, operated by Columbia Gas Transmission, LLC.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Medina New Drills Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP26-44”. Federal Energy Regulatory Commission. 17 December 2025. Retrieved 3 October 2026.
  2. “Columbia Gas Transmission, LLC submits Weekly Construction Status Report No. 27 for the period of 09/20/2026 to 09/26/2026 re the Medina New Drills Project under CP26-44.”. Columbia Gas Transmission, LLC (filed with FERC). 29 September 2026. Retrieved 3 October 2026.
  3. “Environmental Assessment Report for Columbia Gas Transmission, LLC's 157.205 and 157.213(b) – Prior Notice Filing – Modifications of Natural Gas Storage Field Facilities under CP26-44.”. Federal Energy Regulatory Commission (staff document). 27 February 2026. Retrieved 3 October 2026.
  4. “Columbia Gas Transmission, LLC submits Weekly Construction Status Report No. 1 for the period of 03/22/2026 to 03/28/2026 re the Medina New Drills Project under CP26-44.”. Columbia Gas Transmission, LLC (filed with FERC). 1 April 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.