MGT Eastern Extension Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
MGT Eastern Extension Project is a natural gas pipeline expansion in Tennessee, operated by Midwestern Gas Transmission Company. It runs 30.9 miles of 16" pipe.
| MGT Eastern Extension Project | |
|---|---|
| Also called | MidWest 2006 Eastern Extension Project[1], 16-inch diameter pipeline & related facilities known as the Eastern Extension Project[2] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[3] |
| Status | In service[3][4] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | Tennessee[1][3] |
| Approved | 10 March 2006[1][5] |
| In service | 15 April 2008[3] or 7 January 2008[4][sources disagree] |
| FERC docket | CP05-372[1] |
| FERC pre-filing docket | PF05-2[1] |
| Technical information | |
| Length | 30.9 mi[1][3] |
| Pipe size | 16"[3] |
| Capacity | 120 MMcf/d (FERC project list)[1][3] |
| Cost | $26.27 million (EIA estimate; no dollar year given)[3] |
| On ProvenHand | |
| Hands listed | 0 |
MGT Eastern Extension Project is a natural gas pipeline expansion in Tennessee, operated by Midwestern Gas Transmission Company. It runs 30.9 miles of 16" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on MGT Eastern Extension Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “FERC eLibrary docket CP05-372”. Federal Energy Regulatory Commission. 6 June 2005. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Midwestern Gas Transmission Company notice that it placed into service the authorized facilities on 1/7/08 (CP05-372)”. Midwestern Gas Transmission Company (filed with FERC). 11 January 2008. Retrieved 4 October 2026.
- “Order Issuing Certificate, Midwestern Gas Transmission Company, MGT Eastern Extension (CP05-372)”. FERC. 10 March 2006. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.