MGT Eastern Extension Project is a natural gas pipeline expansion in Tennessee, operated by Midwestern Gas Transmission Company. It runs 30.9 miles of 16" pipe.

MGT Eastern Extension Project
Also calledMidWest 2006 Eastern Extension Project[1], 16-inch diameter pipeline & related facilities known as the Eastern Extension Project[2]
General information
KindPipeline project[1]
Project typeExpansion[3]
StatusIn service[3][4]
CommodityNatural gas[3]
Owner and operator
StateTennessee[1][3]
Approved10 March 2006[1][5]
In service15 April 2008[3] or 7 January 2008[4][sources disagree]
FERC docketCP05-372[1]
FERC pre-filing docketPF05-2[1]
Technical information
Length30.9 mi[1][3]
Pipe size16"[3]
Capacity120 MMcf/d (FERC project list)[1][3]
Cost$26.27 million (EIA estimate; no dollar year given)[3]
On ProvenHand
Hands listed0

MGT Eastern Extension Project is a natural gas pipeline expansion in Tennessee, operated by Midwestern Gas Transmission Company. It runs 30.9 miles of 16" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
In service
  • 15 April 2008[3]
  • 7 January 2008[4]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on MGT Eastern Extension Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP05-372”. Federal Energy Regulatory Commission. 6 June 2005. Retrieved 3 October 2026.
  3. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  4. “Midwestern Gas Transmission Company notice that it placed into service the authorized facilities on 1/7/08 (CP05-372)”. Midwestern Gas Transmission Company (filed with FERC). 11 January 2008. Retrieved 4 October 2026.
  5. “Order Issuing Certificate, Midwestern Gas Transmission Company, MGT Eastern Extension (CP05-372)”. FERC. 10 March 2006. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.