Mid-Atlantic Connector Expansion Project
From the ProvenHand pipeline wiki
Mid-Atlantic Connector Expansion Project is a natural gas pipeline expansion in Virginia, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2011.
| Mid-Atlantic Connector Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2][3] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Virginia[1][2] |
| Approved | 1 July 2011[1] |
| Construction started | 7 September 2011[4] |
| In service | 22 February 2013[2] or January 2013[5][sources disagree] |
| FERC docket | CP11-31[1] |
| FERC pre-filing docket | PF10-16[1] |
| Technical information | |
| Length | 2.8 mi[1] or 1.4 mi[2][sources disagree] |
| Pipe size | 42"[2] |
| Capacity | 142 MMcf/d (FERC project list)[1][2] |
| Cost | $55 million (EIA estimate; no dollar year given)[2] or $60,260,578 actual/estimate at completion as of July 2013 for the expansion facilities (Station 175 HP replacement of $2[6][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Mid-Atlantic Connector Expansion Project is a natural gas pipeline expansion in Virginia, operated by Transcontinental Gas Pipe Line Company, LLC. Construction began in 2011.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Cost | |
| In service | |
| Length |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Mid-Atlantic Connector Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP11-31”. Federal Energy Regulatory Commission. 12 November 2010. Retrieved 3 October 2026.
- “Notice of commencement of construction, Mid-Atlantic Connector Expansion Project (CP11-31)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 14 September 2011. Retrieved 4 October 2026.
- “Transcontinental Gas Pipe Line Company, LLC Form 10-Q (quarter ended 2013-03-31)”. Transcontinental Gas Pipe Line Company, LLC (SEC filing). 8 May 2013. Retrieved 4 October 2026.
- “Six-month construction cost report, Mid-Atlantic Connector Expansion Project (CP11-31)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 26 August 2013. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.