Midcontinent Express Pipeline Expansion

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Midcontinent Express Pipeline Expansion is a natural gas pipeline expansion, operated by Midcontinent Express Pipeline LLC. It entered service in 2010.

Midcontinent Express Pipeline Expansion
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StatesLA, MS, TX[1] or LA, OK, TX[2][sources disagree]
Approved17 September 2009[1]
In service31 May 2010[2]
FERC docketCP09-56[1]
Technical information
Capacity300 MMcf/d (FERC project list)[1] or 1500 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$1340 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Midcontinent Express Pipeline Expansion is a natural gas pipeline expansion, operated by Midcontinent Express Pipeline LLC. It entered service in 2010.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 300 MMcf/d (FERC project list)[1]
  • 1500 MMcf/d additional capacity (EIA)[2]
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Midcontinent Express Pipeline Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.