Middlesex Expansion Project
From the ProvenHand pipeline wiki
Middlesex Expansion Project is a natural gas pipeline expansion in New Jersey, operated by Texas Eastern Transmission, LP/Middlesex Extension Project. It entered service in 2021. It runs 1.8 miles of 16", 20" pipe.
| Middlesex Expansion Project | |
|---|---|
| Also called | Middlesex Extension Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Expansion[3] |
| Status | In service[3] |
| Commodity | Natural gas[3] |
| Operator | Texas Eastern Transmission, LP/Middlesex Extension Project[2] |
| Operator | |
| Owner and operator | |
| State | New Jersey[2][3] |
| Counties | Middlesex[4] |
| Approved | 15 October 2020[2][4] |
| In service | 28 September 2021[3][5] |
| FERC docket | CP20-30[2] |
| Technical information | |
| Length | 1.8 mi[2][3] |
| Pipe size | 16", 20"[3][4] |
| Capacity | 264 MMcf/d (FERC project list)[2][3] |
| Cost | $52 million (EIA estimate; no dollar year given)[3] or approximately $53 million (certificate order)[4][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Middlesex Expansion Project is a natural gas pipeline expansion in New Jersey, operated by Texas Eastern Transmission, LP/Middlesex Extension Project. It entered service in 2021. It runs 1.8 miles of 16", 20" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Cost |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Middlesex Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP20-30”. Federal Energy Regulatory Commission. 19 December 2019. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order Issuing Certificate, Texas Eastern Transmission, LP, Middlesex Extension Project (CP20-30)”. FERC (order). 15 October 2020. Retrieved 4 October 2026.
- “Notice of Commencement of Service, Middlesex Extension Project (CP20-30)”. Texas Eastern Transmission, LP (filed with FERC). 29 September 2021. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.