Minot Expansion Project
From the ProvenHand pipeline wiki
Minot Expansion Project is a pipeline project, operated by WBI Energy Transmission, Inc.. It entered service in 2025.
| Minot Expansion Project | |
|---|---|
| General information | |
| Status | In service[1] |
| Owner and operator | |
| Counties | Morton[3] |
| In service | 1 November 2025[1] |
| FERC docket | CP25-75[2] |
| Technical information | |
| Pipe size | 12", 16"[3] |
| Capacity added | 7,000 equivalent dekatherms per day of firm transportation capacity[3] |
| Cost | 13,000,000[3] |
| On ProvenHand | |
| Hands listed | 0 |
Minot Expansion Project is a pipeline project, operated by WBI Energy Transmission, Inc.. It entered service in 2025.
Crossings
| Feature | Method |
|---|---|
| 24th St NW[3] | Bore |
| 27th St NW[3] | Bore |
| 38th St East[3] | Bore |
| 38th St West[3] | Bore |
| Beretta St NW[3] | Bore |
| Highway 1806[3] | Bore |
| I-94[3] | Bore |
| Interstate Highway I-94, Wetland 9[3] | Bore |
| Old Red Trail[3] | Bore |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Minot Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Minot Expansion”. WBI Energy (operator website). Retrieved 3 October 2026.
- “FERC eLibrary docket CP25-75”. Federal Energy Regulatory Commission. 13 February 2025. Retrieved 3 October 2026.
- “Environmental Assessment Report for WBI Energy Transmission, Inc.'s Sections 157.205, 157.210 – Prior Notice Filing – Construction and Mainline Natural Gas Facilities under CP25-75.”. Federal Energy Regulatory Commission (staff document). 22 April 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.