Mississippi Crossing Project is a natural gas pipeline in Alabama and Mississippi, operated by Tennessee Gas Pipeline Company, L.L.C.. It runs 208 miles of 36", 42" pipe.

Mississippi Crossing Project
Also calledMississippi Crossing (MSX)[1]
General information
KindPipeline project[1]
Project typeNew build[2]
StatusApproved[2][3]
CommodityNatural gas[2]
Owner and operator
StatesAlabama, Mississippi[2][4][5]
Approved31 July 2026[3][4]
FERC docketCP25-514[1]
FERC pre-filing docketPF25-2[1]
Technical information
Length208 mi[2][4][5]
Pipe size36 in, 42 in[2] or 30 in, 36 in, 42 in[3][sources disagree]
Capacity2100 MMcf/d (FERC project list)[2][4][5]
Cost$1700 million (EIA estimate; no dollar year given)[2][3]
On ProvenHand
Hands listed0

Mississippi Crossing Project is a natural gas pipeline in Alabama and Mississippi, operated by Tennessee Gas Pipeline Company, L.L.C.. It runs 208 miles of 36", 42" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Diameters
  • 36 in, 42 in[2]
  • 30 in, 36 in, 42 in[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Mississippi Crossing Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP25-514”. Federal Energy Regulatory Commission. 30 June 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Order Issuing Certificates and Approving Abandonment, Mississippi Crossing Project and South System Expansion 4 Project (CP25-514, CP25-517)”. Federal Energy Regulatory Commission. 31 July 2026. Retrieved 4 October 2026.
  4. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  5. “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.