Mississippi Hub Storage Phase 1 is a natural gas pipeline lateral in Mississippi, operated by Mississippi Hub LLC. It entered service in 2008.
| Mississippi Hub Storage Phase 1 | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| State | Mississippi[1] |
| Counties | Jefferson Davis, Simpson[3] |
| Approved | 15 February 2007[3] |
| In service | 15 December 2008[1] |
| FERC docket | CP07-4[1] |
| Technical information | |
| Length | 11 mi[1] or 11.3 mi[3][sources disagree] |
| Pipe size | 36"[1] |
| Capacity | 1200 MMcf/d additional capacity (EIA)[1] |
| Units added | 3 (natural gas engine); 3 (electric motor)[3] |
| Horsepower added | 29,205 hp[3] |
| On ProvenHand | |
| Hands listed | 0 |
Mississippi Hub Storage Phase 1 is a natural gas pipeline lateral in Mississippi, operated by Mississippi Hub LLC. It entered service in 2008.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Mississippi Hub Storage Phase 1? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP07-4”. Federal Energy Regulatory Commission. 10 October 2006. Retrieved 3 October 2026.
- “Order Issuing Certificates, Mississippi Hub, LLC (CP07-4, CP07-5, CP07-6)”. Federal Energy Regulatory Commission. 15 February 2007. Retrieved 4 October 2026.