Mississippi Hub Storage Phase 1

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Mississippi Hub Storage Phase 1 is a natural gas pipeline lateral in Mississippi, operated by Mississippi Hub LLC. It entered service in 2008.

Mississippi Hub Storage Phase 1
General information
KindPipeline project[1]
Project typeLateral[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
Owner and operator
StateMississippi[1]
CountiesJefferson Davis, Simpson[3]
Approved15 February 2007[3]
In service15 December 2008[1]
FERC docketCP07-4[1]
Technical information
Length11 mi[1] or 11.3 mi[3][sources disagree]
Pipe size36"[1]
Capacity1200 MMcf/d additional capacity (EIA)[1]
Units added3 (natural gas engine); 3 (electric motor)[3]
Horsepower added29,205 hp[3]
On ProvenHand
Hands listed0

Mississippi Hub Storage Phase 1 is a natural gas pipeline lateral in Mississippi, operated by Mississippi Hub LLC. It entered service in 2008.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Mississippi Hub Storage Phase 1? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP07-4”. Federal Energy Regulatory Commission. 10 October 2006. Retrieved 3 October 2026.
  3. “Order Issuing Certificates, Mississippi Hub, LLC (CP07-4, CP07-5, CP07-6)”. Federal Energy Regulatory Commission. 15 February 2007. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.