Mississippi Hub Storage Phase 2
From the ProvenHand pipeline wiki
Mississippi Hub Storage Phase 2 is a natural gas pipeline in Mississippi, operated by Mississippi Hub LLC. It entered service in 2012. It runs 36.8 miles of 24", 30" pipe.
| Mississippi Hub Storage Phase 2 | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| State | Mississippi[1] |
| Approved | 17 September 2009[3] |
| In service | 9 August 2012[1] |
| FERC docket | CP09-110[1] |
| Technical information | |
| Length | 36.8 mi[1] |
| Pipe size | 24", 30"[1] |
| Capacity | 200 MMcf/d additional capacity (EIA)[1] |
| Cost | $75 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Mississippi Hub Storage Phase 2 is a natural gas pipeline in Mississippi, operated by Mississippi Hub LLC. It entered service in 2012. It runs 36.8 miles of 24", 30" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Mississippi Hub Storage Phase 2? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP09-110”. Federal Energy Regulatory Commission. 6 April 2009. Retrieved 3 October 2026.
- “Order issuing certificate re Mississippi Hub, LLC (CP09-110), eLibrary filing description”. FERC. 17 September 2009. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.