Mobile Bay South Expansion Project
From the ProvenHand pipeline wiki
Mobile Bay South Expansion Project is a natural gas pipeline expansion in Alabama, operated by Transcontinental Gas Pipe Line Company, LLC. It entered service in 2010. It runs 0.5 miles of 30" pipe.
| Mobile Bay South Expansion Project | |
|---|---|
| Also called | Transco Mobile Bay South Expansion[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2][3] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Facility project | |
| State | Alabama[1][2] |
| Counties | Choctaw[4] |
| Approved | 7 May 2009[1] |
| In service | May 2010[2][5] |
| FERC docket | CP08-476[1] |
| Technical information | |
| Length | 0.5 mi[1] |
| Pipe size | 30"[4] |
| Capacity | 253.5 MMcf/d (FERC project list)[1][2] |
| Cost | $36.903 million (EIA estimate; no dollar year given)[2] or approximately $34 million estimated capital cost[5][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Mobile Bay South Expansion Project is a natural gas pipeline expansion in Alabama, operated by Transcontinental Gas Pipe Line Company, LLC. It entered service in 2010. It runs 0.5 miles of 30" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Cost |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Mobile Bay South Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP08-476”. Federal Energy Regulatory Commission. 18 September 2008. Retrieved 3 October 2026.
- “Order Issuing Certificate, Transcontinental Gas Pipe Line Corporation, Mobile Bay South Expansion Project (CP08-476)”. Federal Energy Regulatory Commission. 7 May 2009. Retrieved 4 October 2026.
- “Transcontinental Gas Pipe Line Company, LLC Form 10-Q for the quarter ended June 30, 2010”. Transcontinental Gas Pipe Line Company, LLC (SEC filing). 29 July 2010. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.