Mobile Bay South II Expansion Project
From the ProvenHand pipeline wiki
Mobile Bay South II Expansion Project is a natural gas pipeline expansion in Alabama, operated by Transcontinental Gas Pipe Line Company, LLC. It entered service in 2011.
| Mobile Bay South II Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2][3] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Alabama[1][2] |
| Counties | Choctaw, Mobile[4] |
| Approved | 26 July 2010[1] |
| In service | May 2011[2] |
| FERC docket | CP10-21[1] |
| Technical information | |
| Capacity | 380 MMcf/d (FERC project list)[1][2] |
| Cost | $36 million (EIA estimate; no dollar year given)[2] or $33,142,337 actual costs plus forecast as of 2011-09-30 (Exhibit K estimate $36,323,000)[5][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Mobile Bay South II Expansion Project is a natural gas pipeline expansion in Alabama, operated by Transcontinental Gas Pipe Line Company, LLC. It entered service in 2011.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Cost |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Mobile Bay South II Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP10-21”. Federal Energy Regulatory Commission. 16 November 2009. Retrieved 3 October 2026.
- “Implementation Plan, Mobile Bay South II Expansion Project (CP10-21)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 11 August 2010. Retrieved 4 October 2026.
- “Construction Cost Report, Mobile Bay South II Expansion Project (CP10-21)”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 1 November 2011. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.