Molalla Capacity Replacement Project
From the ProvenHand pipeline wiki
Molalla Capacity Replacement Project is a natural gas pipeline replacement in Oregon, operated by Northwest Pipeline LLC. It runs 7.8 miles of 20" pipe.
| Molalla Capacity Replacement Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1] |
| Status | In service[2] |
| Commodity | Natural gas[3] |
| Owner and operator |
|
| State | Oregon[3] |
| Counties | Clackamas, Marion[3] |
| Approved | 30 June 2011[2] |
| FERC docket | CP11-59[1] |
| Technical information | |
| Length | 7.8 mi[3] |
| Pipe size | 20"[3] |
| On ProvenHand | |
| Hands listed | 0 |
Molalla Capacity Replacement Project is a natural gas pipeline replacement in Oregon, operated by Northwest Pipeline LLC. It runs 7.8 miles of 20" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Molalla Capacity Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP11-59”. Federal Energy Regulatory Commission. 11 January 2011. Retrieved 3 October 2026.
- “Notice of Completion and Placement into Service, Molalla Capacity Replacement Project (CP11-59)”. Northwest Pipeline GP (filed with FERC). 3 November 2011. Retrieved 4 October 2026.
- “Environmental Assessment, Northwest Pipeline Molalla Capacity Replacement Project (CP11-59)”. FERC. 11 May 2011. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.