Momentum Expansion Project
From the ProvenHand pipeline wiki
Momentum Expansion Project is a pipeline project in Alabama, Georgia, Mississippi and North Carolina, operated by Transcontinental Gas Pipe Line Company, LLC. It runs 50 miles.
| Momentum Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Owner and operator | |
| States | Alabama, Georgia, Mississippi, North Carolina[1] |
| Approved | 14 February 2002[1] |
| FERC docket | CP01-388[1] |
| Technical information | |
| Length | 50 mi[1] |
| Capacity | 322.9 MMcf/d (FERC project list)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Momentum Expansion Project is a pipeline project in Alabama, Georgia, Mississippi and North Carolina, operated by Transcontinental Gas Pipe Line Company, LLC. It runs 50 miles.
Pipe mills
| Mill | Grade | Years |
|---|---|---|
| Berg Pipe Panama City Corp.[2] | X70 | 1 January 2002 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Momentum Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Project List (BSPC Reference List), bergpipe.com, 2009 capture”. Berg Steel Pipe Corp. (Berg Pipe). Archived from the original on 16 July 2009. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.