Moss Bluff 2011 Storage Header
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Moss Bluff 2011 Storage Header is a natural gas pipeline lateral in Texas, operated by Spectra Energy. Construction began in 2008 and the line entered service in 2012.
| Moss Bluff 2011 Storage Header | |
|---|---|
| Also called | Scope of Work Contained in the Cavern 4 Expansion Project[1], Cavern 4 Expansion Project[2] |
| General information | |
| Kind | Pipeline project[3] |
| Project type | Lateral[3] |
| Status | In service[3] |
| Commodity | Natural gas[3] |
| Operator | |
| Owner and operator | |
| State | Texas[3] |
| Counties | Liberty[4] |
| Construction started | June 2008[2] |
| In service | 2012[3] |
| FERC docket | CP08-387[3] |
| Contractors | |
| Technical information | |
| Length | 2.6 mi[3] or 2.5 mi[2][sources disagree] |
| Pipe size | 30"[3] |
| On ProvenHand | |
| Hands listed | 0 |
Moss Bluff 2011 Storage Header is a natural gas pipeline lateral in Texas, operated by Spectra Energy. Construction began in 2008 and the line entered service in 2012.
Contractorsedit
| Contractor | Work |
|---|---|
| Malcolm Pirnie, Inc.[2] | environmental consultant (prepared the supplemental advance notification report) |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Moss Bluff 2011 Storage Header? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP08-387”. Federal Energy Regulatory Commission. 5 May 2008. Retrieved 3 October 2026.
- “Second Supplemental Advance Notification of Construction of Facilities, Cavern 4 Expansion Project (CP08-387)”. Moss Bluff Hub, LLC (filed with FERC). 23 December 2009. Retrieved 4 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Moss Bluff Hub, LLC Advanced Notification of Construction of Facilities located in Liberty County, TX, pursuant to Section 284.11 (CP08-387), eLibrary filing description”. Moss Bluff Hub, LLC (filed with FERC). 5 May 2008. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.