MS Hub Capacity Expansion Project is a natural gas pipeline expansion in Mississippi, operated by Mississippi Hub LLC. Construction began in 2025.
| MS Hub Capacity Expansion Project | |
|---|---|
| General information | |
| Project type | Expansion[1] |
| Status | Under construction[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | Mississippi[3] |
| Counties | Simpson[3] |
| Approved | 20 March 2025[4] |
| Construction started | 2025[2] |
| FERC docket | CP24-80[1] |
| Technical information | |
| Capacity added | up to 1.0 Bcf per day of delivery capacity (and up to 0.7 Bcf/d injection)[3] |
| Units added | 2 (electric motor); 3 × Caterpillar G3616 A4 (gas engine)[3] |
| On ProvenHand | |
| Hands listed | 0 |
MS Hub Capacity Expansion Project is a natural gas pipeline expansion in Mississippi, operated by Mississippi Hub LLC. Construction began in 2025.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on MS Hub Capacity Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP24-80”. Federal Energy Regulatory Commission. 5 March 2024. Retrieved 3 October 2026.
- “Monthly Construction Progress Report No. 3 (Jun 14 - Jul 14, 2025), MS Hub Capacity Expansion Project”. Mississippi Hub, LLC (filed with FERC). 16 July 2025. Retrieved 4 October 2026.
- “Environmental Assessment, MS Hub Capacity Expansion Project (CP24-80)”. FERC staff. 30 October 2024. Retrieved 4 October 2026.
- “Order Issuing Certificate, Mississippi Hub, LLC (CP24-80)”. FERC (order). 20 March 2025. Retrieved 4 October 2026.