Natchez Pipeline Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Natchez Pipeline Project is a natural gas pipeline in Louisiana and Mississippi, operated by American Midstream (Midla), LLC.

Natchez Pipeline Project
Also calledNatchez Pipeline Project (Midla)[1]
General information
KindPipeline project[1]
Project typeNew build[2]
StatusIn service[2]
CommodityNatural gas[2][3]
Owner and operator
Operator
StatesLouisiana, Mississippi[1][2]
CountiesLouisiana: Catahoula, Concordia, Franklin
Mississippi: Adams
[3]
Approved17 December 2015[1][3]
In service29 March 2017[2] or 31 March 2017[4][sources disagree]
FERC docketCP15-523[1]
Technical information
Length52.5 mi[1] or 52 mi[2][3][sources disagree]
Pipe size12"[2]
Capacity48.3 MMcf/d (FERC project list)[1] or 48 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$66.2 million (EIA estimate; no dollar year given)[2] or approximately $62.8 million (FERC order; its rate filing uses $66.2 million)[3][sources disagree]
On ProvenHand
Hands listed0

Natchez Pipeline Project is a natural gas pipeline in Louisiana and Mississippi, operated by American Midstream (Midla), LLC.

Spreads

Spread
Single construction spread[5]

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 48.3 MMcf/d (FERC project list)[1]
  • 48 MMcf/d additional capacity (EIA)[2]
Cost
  • $66.2 million (EIA estimate; no dollar year given)[2]
  • approximately $62.8 million (FERC order; its rate filing uses $66.2 million)[3]
In service
  • 29 March 2017[2]
  • 31 March 2017[4]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Natchez Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Order Issuing Certificate, American Midstream (Midla), LLC, Natchez Pipeline Project (CP15-523)”. FERC. 17 December 2015. Retrieved 3 October 2026.
  4. “Notice of Commencement of Service (resubmitted), Natchez Pipeline (CP15-523)”. American Midstream (Midla), LLC (filed with FERC). 10 April 2017. Retrieved 3 October 2026.
  5. “Implementation Plan, Natchez Pipeline Project (CP15-523)”. American Midstream (Midla), LLC (filed with FERC). 6 January 2016. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.