National Fuel Gas Supply Abandonment Project is a pipeline replacement in New York, operated by National Fuel Gas Supply Corporation. It was built and entered service in 2017. It runs 8.2 miles of 20", 24" pipe.

National Fuel Gas Supply Abandonment Project
Also calledLine T2KNY/Line TNY/Line KNY[1], Line T2KNY Install, Line TNY Replacement, and Line KNY Abandonment[2]
General information
KindPipeline project[1][3]
Project typeReplacement[1][3]
StatusIn service[4]
Owner and operator
Operator
StateNew York[1]
CountiesErie[2][5]
Approved20 September 2016[6][7]
Construction started16 May 2017[8]
In service14 December 2017[4]
FERC docketCP16-125[3]
Technical information
Length8.2 mi[1]
Pipe size20", 24"[5]
Capacity addedan additional 2.6 MMcf/d of capacity[9]
Cost$29,382,602 (EA cost line; no dollar year given)[5]
On ProvenHand
Hands listed0

National Fuel Gas Supply Abandonment Project is a pipeline replacement in New York, operated by National Fuel Gas Supply Corporation. It was built and entered service in 2017. It runs 8.2 miles of 20", 24" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on National Fuel Gas Supply Abandonment Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Ongoing Projects: Construction Underway (Pipeline News, May 2017)”. Pipeline News. May 2017. Retrieved 3 October 2026.
  2. “Ongoing Projects: Construction Underway (Pipeline News, October 2018)”. Pipeline News. October 2018. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP16-125”. Federal Energy Regulatory Commission. 4 April 2016. Retrieved 3 October 2026.
  4. “In-service notification, Line TNY, Line T2KNY Install, Line TNY Replacement and Line KNY Abandonment Project (CP16-125)”. Federal Energy Regulatory Commission (eLibrary filing). 18 December 2017. Retrieved 4 October 2026.
  5. “Environmental Assessment, Line T2KNY Install, Line TNY Replacement, and Line KNY Abandonment Project (CP16-125)”. Federal Energy Regulatory Commission. 3 August 2016. Retrieved 4 October 2026.
  6. “Order granting abandonment and issuing certificate, National Fuel Gas Supply Corporation (CP16-125)”. Federal Energy Regulatory Commission (eLibrary filing). 20 September 2016. Retrieved 4 October 2026.
  7. “In-service notification, Line T2KNY Install, East Eden and North Boston M&R station modifications (CP16-125)”. Federal Energy Regulatory Commission (eLibrary filing). 12 December 2017. Retrieved 4 October 2026.
  8. “Notice that Construction Activities Commenced (CP16-125)”. National Fuel Gas Supply Corporation (filed with FERC). 18 May 2017. Retrieved 4 October 2026.
  9. “Office of Energy Projects Energy Infrastructure Update for September 2016”. Federal Energy Regulatory Commission. September 2016. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.