Natural Gas Pipeline Company of America CP08-401 is a pipeline project, operated by Natural Gas Pipeline Company of America LLC. It runs 0.4 miles of 24" pipe.
| Natural Gas Pipeline Company of America CP08-401 | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Owner and operator | |
| Counties | Jefferson[2] |
| FERC docket | CP08-401[1] |
| Technical information | |
| Length | 0.4 mi[2] |
| Pipe size | 24"[2] |
| Capacity | receive up to 900 MMcf/day of re-vaporized LNG[2] |
| Cost | approximately $2.5 million (reimbursed by Golden Pass)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Natural Gas Pipeline Company of America CP08-401 is a pipeline project, operated by Natural Gas Pipeline Company of America LLC. It runs 0.4 miles of 24" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Natural Gas Pipeline Company of America CP08-401? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP08-401”. Federal Energy Regulatory Commission. 15 May 2008. Retrieved 3 October 2026.
- “Natural Gas Pipeline Company of America LLC; Notice of Request Under Blanket Authorization (Docket No. CP08-401-000), Federal Register E8-11914”. Federal Energy Regulatory Commission (published in the Federal Register). 29 May 2008. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.