Neches River Crossing Replacement Project is a natural gas pipeline replacement in Texas, operated by Texas Eastern Transmission, LP. Construction began in 2022.

Neches River Crossing Replacement Project
General information
Project typeReplacement[1]
CommodityNatural gas[2]
Owner and operator
StateTexas[2]
CountiesJefferson, Orange[2]
Approved13 September 2022[3]
Construction started13 September 2022[3]
FERC docketCP22-483[1]
Technical information
Pipe size30"[2]
Costapproximately $25,000,000[2]
On ProvenHand
Hands listed0

Neches River Crossing Replacement Project is a natural gas pipeline replacement in Texas, operated by Texas Eastern Transmission, LP. Construction began in 2022.

Crossings

FeatureMethod
Neches River[4]HDD

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Neches River Crossing Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP22-483”. Federal Energy Regulatory Commission. 1 July 2022. Retrieved 3 October 2026.
  2. “Notice of Request Under Blanket Authorization, Texas Eastern Transmission, LP (CP22-483)”. Federal Energy Regulatory Commission. 13 July 2022. Retrieved 4 October 2026.
  3. “Weekly Status Report for September 13-18, 2022, Neches River Crossing Replacement (CP22-483)”. Texas Eastern Transmission, LP (filed with FERC). 28 September 2022. Retrieved 4 October 2026.
  4. “Environmental Assessment Report, Texas Eastern Sections 157.205 and 157.208 (CP22-483)”. Federal Energy Regulatory Commission (staff report). 12 September 2022. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.