Neches River Crossing Replacement Project is a natural gas pipeline replacement in Texas, operated by Texas Eastern Transmission, LP. Construction began in 2022.
| Neches River Crossing Replacement Project | |
|---|---|
| General information | |
| Project type | Replacement[1] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Texas[2] |
| Counties | Jefferson, Orange[2] |
| Approved | 13 September 2022[3] |
| Construction started | 13 September 2022[3] |
| FERC docket | CP22-483[1] |
| Technical information | |
| Pipe size | 30"[2] |
| Cost | approximately $25,000,000[2] |
| On ProvenHand | |
| Hands listed | 0 |
Neches River Crossing Replacement Project is a natural gas pipeline replacement in Texas, operated by Texas Eastern Transmission, LP. Construction began in 2022.
Crossings
| Feature | Method |
|---|---|
| Neches River[4] | HDD |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Neches River Crossing Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP22-483”. Federal Energy Regulatory Commission. 1 July 2022. Retrieved 3 October 2026.
- “Notice of Request Under Blanket Authorization, Texas Eastern Transmission, LP (CP22-483)”. Federal Energy Regulatory Commission. 13 July 2022. Retrieved 4 October 2026.
- “Weekly Status Report for September 13-18, 2022, Neches River Crossing Replacement (CP22-483)”. Texas Eastern Transmission, LP (filed with FERC). 28 September 2022. Retrieved 4 October 2026.
- “Environmental Assessment Report, Texas Eastern Sections 157.205 and 157.208 (CP22-483)”. Federal Energy Regulatory Commission (staff report). 12 September 2022. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.