New Lisbon 2020 Expansion Project
From the ProvenHand pipeline wiki
New Lisbon 2020 Expansion Project is a natural gas pipeline expansion in Wisconsin, operated by Northern Natural Gas Company. It was built and entered service in 2020. It runs 7.4 miles of 8" pipe.
| New Lisbon 2020 Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1][2] |
| Status | In service[1][3] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| State | Wisconsin[1] |
| Counties | Juneau, Sauk[4] |
| Construction started | 8 June 2020[5] |
| In service | 29 October 2020[1] |
| FERC docket | CP20-17[1] |
| Contractors | |
| Technical information | |
| Length | 7.4 mi[1] |
| Pipe size | 8"[1][4] |
| Capacity | 15 MMcf/d additional capacity (EIA)[1] |
| Capacity added | an incremental 15,180 dekatherms per day[4] |
| Units added | 1 (electric motor, 800 hp each)[4] |
| Cost | $24.6 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
New Lisbon 2020 Expansion Project is a natural gas pipeline expansion in Wisconsin, operated by Northern Natural Gas Company. It was built and entered service in 2020. It runs 7.4 miles of 8" pipe.
Contractorsedit
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on New Lisbon 2020 Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP20-17”. Federal Energy Regulatory Commission. 25 November 2019. Retrieved 3 October 2026.
- “Final weekly environmental inspector report No. 56, New Lisbon 2020 Expansion (CP20-17)”. Northern Natural Gas Company (filed with FERC). 21 July 2021. Retrieved 4 October 2026.
- “Notice of Request Under Blanket Authorization, Northern Natural Gas Company (CP20-17)”. Federal Energy Regulatory Commission. 4 December 2019. Retrieved 4 October 2026.
- “Weekly report (first), New Lisbon expansion project (CP20-17)”. Northern Natural Gas Company (filed with FERC). 18 June 2020. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.